I am in the process of upgrading from a 2 tap kegerator to a 4 tap Keezer. Here are some quick snaps of my progress.
Frame Insulated
Exterior Details
Exterior details
Collar set on for testing
interior with collar
Collar with lid set on
Tap holes drilled
Faucets installed w/ Chalkboard paint
Collar installed
Lid attached to collar
Testing Drip Tray height
First Beer tapped from the new setup (Oatmeal stout)