Building a Keezer!

I am in the process of upgrading from a 2 tap kegerator to a 4 tap Keezer.  Here are some quick snaps of my progress.

 

Testing with Kegs inside
Testing with Kegs inside

 

Frame Insulated

Frame Insulated

Exterior Details

Exterior Details

Exterior details

Exterior details

Collar set on for testing

Collar set on for testing

interior with collar

interior with collar

Collar with lid set on

Collar with lid set on

Tap holes drilled

Tap holes drilled

Faucets installed w/ Chalkboard paint

Faucets installed w/ Chalkboard paint

Collar installed

Collar installed

Lid attached to collar

Lid attached to collar

Testing Drip Tray height

Testing Drip Tray height

First Beer tapped from the new setup (Oatmeal stout)

First Beer tapped from the new setup (Oatmeal stout)

 

 

 

This entry was posted in Brewing Projects. Bookmark the permalink.